VoltVerify™ · NERC O&P

Operations & Planning Reliability Standards Readiness Assessment

Scope readiness by registered function, then evaluate operating practices, planning processes, evidence, exceptions, and corrective actions across applicable non-CIP reliability-standard families.

Function-scoped assessment

One master template, only applicable families shown

The template begins with jurisdiction, Regional Entity, registered-function, regional-standard, and effective-date scope questions. VoltVerify uses those answers to display the relevant O&P modules for roles such as BA, DP, GO, GOP, LSE, PC, RC, TO, TOP, TP, and TSP.

Readiness boundary: The JSON is a dated U.S. baseline using original assessment wording. Confirm functional applicability, regional standards, effective dates, implementation plans, and authoritative requirement language before publishing or relying on results.

Covered standard families

BAL

Resource and Demand Balancing

COM

Communications

EOP

Emergency Preparedness and Operations

FAC

Facilities Design, Connections, and Maintenance

INT

Interchange Scheduling and Coordination

IRO

Interconnection Reliability Operations and Coordination

MOD

Modeling, Data, and Analysis

NUC

Nuclear

PER

Personnel Performance, Training, and Qualifications

PRC

Protection and Control

TOP

Transmission Operations

TPL

Transmission Planning

VAR

Voltage and Reactive